|
Driveways: Rural |
|
|
|
Rural Driveway, Layout Standards |
B-1 |
TIFF |
|
Rural Driveway, Type 1: Asphalt Driveway |
B-1a |
TIFF |
|
Rural Driveway, Type 2: Asphalt Driveway |
B-1b |
TIFF |
|
Rural Driveway, Type 3: Asphalt Driveway with Culvert |
B-1c |
TIFF |
|
Rural Driveway, Type 4: Asphalt Driveway w/ Retaining Wall |
B-1d |
TIFF |
|
Driveways: Urban |
|
|
|
Urban Residential Driveway, Layout Standards |
B-2 |
TIFF |
|
Urban Residential Driveway,Residential Driveway |
B-2a |
TIFF |
|
Driveways: Commercial-Industrial |
|
|
|
Commercial-Industrial Driveway, Layout Standards |
B-3 |
TIFF |
|
Commercial-Industrial Driveway, Standard Driveway |
B-3a |
TIFF |
|
Commercial-Industrial Driveway, High Volume Driveway |
B-3b |
TIFF |
|
Commercial-Industrial Driveway, Upward / Downward Driveway |
B-3c |
TIFF |
|
Curb, Gutter & Sidewalk |
|
|
|
Expansion & Weakened Plane Joint Requirements |
C-1 |
TIFF |
|
Type “A” Concrete Curb & Gutter |
C-2 |
TIFF |
|
Type “C” Concrete Curb |
C-2a |
TIFF |
|
Asphalt Dikes |
C-3 |
TIFF |
|
Sidewalks |
C-4 |
TIFF |
|
Curb Ramps |
C-5 |
TIFF |
|
Asphalt Ramp Detail |
C-5a |
TIFF |
|
Drainage |
|
|
|
Deep Retention Basin |
D-1 |
TIFF |
|
Shallow Retention Basin |
D-1a |
TIFF |
|
Catch Basin |
D-2 |
TIFF |
|
Rural Catch Basin-Edge of Pavement Condition |
D-2a |
TIFF |
|
Storm Drain Manhole for Pipe Diameters from 18” to 36” |
D-3 |
TIFF |
|
Storm Drain Manhole for Pipe Diameters Greater Than 36” |
D-3a |
TIFF |
|
Sidewalk Underdrain, Residential |
D-4 |
TIFF |
|
Sidewalk Underdrain, Commercial (Zero Setback) |
D-4a |
TIFF |
|
Cross Gutter & Spandre |
D-5 |
TIFF |
|
Hydrology |
|
|
|
Average Annual Rainfall |
H-1 |
TIFF |
|
Time of Concentration for Watershed Less Than 200 Acres |
H-2 |
TIFF |
|
Runnoff Coefficients for Developed Areas |
H-3 |
TIFF |
|
Runnoff Coefficients for Undeveloped Areas |
H-3a |
TIFF |
|
Rainfall Intensity Data |
H-4 |
TIFF |
|
Rock Slope Protection Sizing Method at Culvert Outlets |
H-5 |
TIFF |
|
Rock Slope Protection Sizing Method at Culvert Outlets |
H-5a |
TIFF |
|
Layout |
|
|
|
Standard County Title Blocks |
L-1 |
TIFF |
|
Standard Abbreviations |
L-2 |
TIFF |
|
Miscellaneous |
|
|
|
Standard Street Monument for Paved Roads |
M-1 |
TIFF |
|
Standard Street Monument for Gravel Roads |
M-1a |
TIFF |
|
Metal Beam Barricade |
M-2 |
TIFF |
|
Temporary Wood Beam Barricade |
M-2a |
TIFF |
|
Sidewalk Barricade |
M-3 |
TIFF |
|
Standard Street Sign |
M-4 |
TIFF |
|
Sidewalk Tree Planter Detail |
M-5 |
TIFF |
|
Tree Trimming Methods |
M-5a |
TIFF |
|
Tree Protection Detail |
M-5b |
TIFF |
|
Repair |
|
|
|
Rural Road Widening, Existing AC Pavement Less Than 3.5” Thick |
R-1 |
TIFF |
|
Rural Road Widening, Existing AC Pavement 3.5” Thick or Greater |
R-1a |
TIFF |
|
Urban Street Widening, Existing AC Pavement Less Than 3.5” Thick |
R-2 |
TIFF |
|
Urban Street Widening, Existing AC Pavement 3.5” Thick or Greater |
R-2a |
TIFF |
|
Curb, Gutter & Sidewalk Repair |
R-3 |
TIFF |
|
Trench Repair, Existing AC Pavement Less Than 3.5” Thick |
R-4 |
TIFF |
|
Trench Repair, Existing AC Pavement 3.5” Thick or Greater |
R-4a |
TIFF |
|
Sanitary Sewer |
|
|
|
Sewer Manhole |
S-1 |
TIFF |
|
Sewer Drop Manhole |
S-1a |
TIFF |
|
Sewer Main Cleanout |
S-2 |
TIFF |
|
Sewer Lateral |
S-3 |
TIFF |
|
Sewer Lateral for Deep Mains |
S-3a |
TIFF |
|
Utilities |
|
|
|
Location of Utilities |
U-1 |
TIFF |
|
Location of Service Laterals |
U-2 |
TIFF |
|
Utility Separation Criteria |
U-3 |
TIFF |
|
Utility Separation Criteria, Case 1: New Sewer Mains |
U-3a |
TIFF |
|
Utility Separation Criteria, Case 2: New Water Mains |
U-3b |
TIFF |
|
Trench Detail, Existing and New Paved Roads |
U-4 |
TIFF |
|
Trench Detail, Non-Paved Areas |
U-4a |
TIFF |
|
Shallow Trench Detail |
U-4b |
TIFF |
|
Water |
|
|
|
Thrust Block Requirements |
W-1 |
TIFF |
|
Thrust Block Details |
W-1a |
TIFF |
|
Fire Hydrant Detail |
W-2 |
TIFF |
|
Valve Anchor & Box |
W-3 |
TIFF |
|
Water Service Connection |
W-4 |
TIFF |
|
Blow-Off Assembly |
W-5 |
TIFF |
|
2” Blow-Off Assembly |
W-5a |
TIFF |
|
1” Air and Vacuum Relief Assembly |
W-6 |
TIFF |
|
Water Sampling Station/Temporary Flushing Port |
W-7 |
TIFF |
|
New Waterline Connection Details |
W-8 |
TIFF |
|
New Waterline Flushing Detail |
W-9 |
TIFF |
|
Waterline Cut-In Tee & Hot Tap Assembly |
W-10 |
TIFF |