Commercial Demolition (CDMO)

Site Plan

  • This file to be names as follows:
    • Site Plan-CDMO2023-000xx.pdf
  • This file to include, but is not limited to:
    • The area to be demolished.
    • Total square feet to be demolished.

Structural Calculations

  • Necessary if it is a partial demolition of the building.
  • This file to be names as follows:
    • Structural Calcs-CDMO2023-000xx.pdf

Supporting Documentation

  • These files to be names as follows:
  • Not limited to:
    • Any previous permits for the original construction of the structure. 
      • Previous Permit-CDMO2023-000xx.pdf
    • Asbestos letter from APCD. 
      • Asbestos Letter-CDMO2023-000xx.pdf
    • Any or all applicable supporting documentation associated with the applied permit.

 

See Attaching Documents to a Permit on how to attach the plans via PermitSLO. Email County Staff contact when you have uploaded the plans.

The plans and supporting documentation must be labeled and packaged before uploading them for initial plan review. Submit a complete initial package only ONCE. Please verify that plans are sized for printing 24” x 36” sheets. Please verify that supporting documentation is sized for printing 8.5”x11” sheets. Staff will reject plans and supporting documentation if not submitted using the naming conventions above. 

PLANS MUST HAVE A BLANK  2”H X 3”W  RECTANGLE ON THE LOWER RIGHT CORNER OF EVERY PAGE (IN THE SAME LOCATION) FOR COUNTY STAMP OF APPROVAL. IT IS THE RESPONSIBILITY OF THE PROFESSIONAL IN CHARGE, CONTRACTOR, AGENT, OWNER TO VERIFY COMPLIANCE WITH THIS REQUIREMENT.

After Issuance Submittal Procedure