Jack Creek Road Bridge Replacement

The project is located immediately north of Highway 46, west of Templeton, on Jack Creek Road. The project site located in Supervisorial District 2.

The existing wooden bridge was built in 1938 and has been deteriorating for several years. The California Department of Transportation (Caltrans) has determined that the existing bridge should be replaced due to its poor condition making the project eligible for federal funding. 

The proposed bridge project includes a new concrete box girder bridge at the same location, and safety improvements including standard approach guard railing and modifications to the roadway elevation. Construction is scheduled for summer 2025.

Project Location

Project Contacts

For questions or additional information please contact Dan Van Beveren via email at [email protected] or phone: (805) 781-4240.

Contact Public Works via web form, email, or call us at (805) 781-5252.