Jack Creek Road Bridge Replacement

The project is located immediately north of Highway 46, west of Templeton, on Jack Creek Road. The project site located in Supervisorial District 2.

The previous wooden bridge was built in 1938 and had been deteriorating for several years. The California Department of Transportation (Caltrans) determined that the existing bridge should be replaced due to its poor condition making the project eligible for federal funding. 

The new bridge is a new concrete box girder bridge at the same location. The project includes safety improvements such as standard approach guard railing and modifications to the roadway elevation. Construction began in 2025, and is scheduled for completion by the end of the year.

Project Location

Project Contacts

For questions or additional information please contact Dan Van Beveren via email at [email protected] or phone: (805) 781-4240.