Search Drainage, Flood, And Stormwater

Forms & Documents > Development Services > Drainage, Flood, And Stormwater

Name Description
central_coast_bioretention_plant_guidance_print

Class-V-Wells-Handout_Final

Description, guidance, and requirements for projects installing underground stormwater infiltration systems

Engineer-Certification-Form

Certification the Stormwater Structural Control Measures (SCMs) were installed consistent with approved plans

PCR-Exemption-Form_v-1

Waiver Request form for documenting criteria used to waive project from complying with PCRs

Post-Construction-Stormwater-Checklist

Stormwater Presentation - 2019-11-08
Stormwater-Control-Plan-Application-Fillable-Form

Application which identifies performance requirements applicable to the project

Stormwater-Control-Plan-Template

Template to assist in preparation of a Stormwater Control Plan which documents a projects compliance with post construction requirements

SWCP-Construction-Checklist

Inspection checklist to assist in determining drainage and stormwater controls comply with the Stormwater Control Plan and drainage plan

Contact Public Works via web form, email, or call us at (805) 781-5252.